PLANNING AND IMPLEMENTING FROM THE "GREEN FIELD"

With our experts from the building sector we are able to plan and implement flexible cost-effective and energy-efficient factories and administration buildings. The specialists from production and logistics create processes and systems for economical and flexible production with you.

Essentially we support you in the three phases of the project:
  • Surveying the base plan
    • Acceptance of processes and specifications
    • Requirement and potential analysis
    • Master plan
    • Determining input factors
  • Working out concepts and solution recommendations
    • Concepts and concept comparisons
    • Planning and conception of production centers, assembly islands and assembly processes
    • Solution scenarios and profitability consideration
    • Implementation scenarios
    • Architectural drafts
  • Detailing of the planning and supervising the implementation
    • Creating detail and installation plans (construction plans)
    • Allocation and monitoring of the sub-systems (buildings, building equipment, production and logistics technology)
    • Construction supervision
    • Layout planning
    • Workplace design
    • Logistics connection
    • Preparation concept
    • Quality future planning
    • Cost analysis and determining plan times
    • Operating and process safety
    • Coordination of series production runs
    • Productivity increase program "Lean Manufacturing"
    • Process optimization (Kaizen, Poka-Yoke, JIT, TPM, LCIA, Kanban, FMEA)
    • Complete acceptance of the planning of domestic and foreign production relocation